Friday 5 September 2008

Monty's overhaul Winter 2008/09

Continually updated.
This is the list of things we have to do to Monty B this winter:

Repair fridge and get large fridge working.
Rebuild of scoop.
Replace all canvas work; sprayhood, sailbags, bimini.
Valet sails inc new sacrificial strip on genoa.
Varnish work, inside and out.
Replacement of worn deck caulking.
Rebed deck fittings where possible.
Strengthening of insides of hull.
Service winches.
Check all piping and replace where necessary.
Replace anodes and seacocks.
Antifouling.
Refurbish heads.
Build a bed big enough to fit a Tim in.
Replace gypsy on windlass.
Fit new fore-hatch.
Fit new portlights in hull.
Revamp hull - repair scratches, gelcoat renewal where necessary, sand and polish.
Paint boot stripe.
Possibly add new stripe detail to hull.
Replace windscreen.

And that, is that!

No comments: